InfrastructureNotableConfirmedDeveloping
7.1
Peru's Obras por Impuestos awards S/7.7bn in 8 months, accelerates pre-El Niño works
El Comercio (Peru)LO·PE·about 12 hours ago
Lima Metro Line 1 ran two trains simultaneously on the viaduct as part of testing for control, signaling, and communication systems. This is a routine technical validation, not a service disruption. The test indicates progress in system integration but carries no immediate market or geopolitical significance.