InfrastructureSingle-source
2.1
Engineers rotate 46,000-ton bridge over Beijing-Guangzhou railway
N1 BosniaLO·CN·2 days ago
Engineering analysis of site documentation indicates that critical steel plate reinforcements specified in structural drawings were omitted from building columns. The discrepancy suggests a failure in construction oversight or quality control, though the extent of the structural compromise remains under investigation.
Locations
Entities