InfrastructureNotableReported
5.2
Azerbaijan targets 30M tons transit cargo, up from 16M expected this year
InterfaxLO·AZ·about 14 hours ago
A new 2.8 km section of Lima's Metropolitano bus rapid transit system on Vía Expresa Grau begins trial runs, extending the route and improving connectivity with Metro de Lima Line 1 ahead of regular service. The trial phase tests operations and schedules; fare costs and full integration details remain to be confirmed. This is a routine infrastructure expansion, notable for urban mobility but not market-moving.
Locations