InfrastructureReported
2.1
Vienna Ring Road renovation begins; costs undisclosed
Die PresseLO·AT·about 11 hours ago
Construction on the Brussels Ring (R0) starts Monday, with temporary loops at exits 12 and 14 and closure of the Kattebroek tunnel until October 16. The project, due by 2029, includes a cycling highway and animal tunnels, signaling a major urban infrastructure overhaul.
Locations