InfrastructureReported
2.1
Iguazu Falls footbridge closed as water flow hits 10.6M L/s
Poder360·BR·2 days ago
Iguazu National Park has reopened all circuits after a historic flood forced closures when river flow hit 12,000 cubic meters per second. The normalization follows a decline in water levels, though residual risks may remain. The reopening restores a key tourism and infrastructure asset in the region.
Locations
Entities